Summers Disk-Chisel User Manual Page 72

  • Download
  • Add to my manuals
  • Print
  • Page
    / 119
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 71
3-6
SECTION 3 – OPERATION
FIELD OPERATION
1. Rephase cylinders before starting eld operation.
2. Choose a at spot in a eld to set tillage depth and level machine.
3. Determine desired tillage depth by working test strips within the eld.
IMPORTANT!
The operator is responsible for adjusting machine since machine does not come “Field
Ready” from factory.
NOTE: Optimum performance of machine is achieved by tilling at a depth and moving at a
speed that does not go beyond limit of trip assemblies. This limit is exceeded if connecting
bolt (shown in the following drawing) continually rides above trip assembly cap.
Page view 71
1 2 ... 67 68 69 70 71 72 73 74 75 76 77 ... 118 119

Comments to this Manuals

No comments